BEREC

The Register is structured chronologically and covers all categories of the documents issued by BEREC and the BEREC Office. Particularly, documents are organized into the following major categories:

The register has been operational since 1 August 2012 and is maintained only electronically by the BEREC Office.
More information on its management can be obtained through the relevant transparency rules published on the current web page.

Document number Document date Document title Document author
BoR PC 06 (20) 09 31 July 2020 Contribution received from HUAWEI during the public consultation on the draft BEREC Guide to the BEREC 5G Radar and 5G Radar HUAWEI
BoR PC 06 (20) 01 31 July 2020 Contribution received from 5G-MAG to the public consultation to draft BEREC Guide to the BEREC 5G Radar and 5G Radar 5G-MAG
BoR (20) 126 16 June 2020 Notice for the launch of the public consultation on the draft BEREC Guide to the BEREC 5G Radar and 5G Radar BEREC
BoR (20) 113 12 June 2020 Draft BEREC Guidelines to foster the consistent application of the criteria for assessing co-investments in new very high capacity network elements (Article 76 EECC) BEREC
BoR (20) 106 11 June 2020 Draft BEREC Guidelines on the Criteria for a Consistent Application of Article 61(3) EECC BEREC
BoR PC 02 (20) 23 30 April 2020 Contribution by VKU to draft BEREC Guidelines on very high capacity networks VKU
BoR PC 02 (20) 31 30 April 2020 Contribution by ECTA to the draft BEREC Guidelines on very high capacity networks ecta
BoR PC 02 (20) 01 30 April 2020 Contribution by Hutchinson Drei to the draft BEREC Guidelines on Guidelines on very high capacity networks Hutchinson Drei
BoR PC 02 (20) 32 30 April 2020 Contribution by Linkem SPA to the draft BEREC Guidelines on very high capacity networks Linkem SPA
BoR PC 02 (20) 34 30 April 2020 Contribution y Vodafone Group to the draft BEREC Guidelines on very high capacity networks Vodafone Group
BoR PC 02 (20) 11 30 April 2020 Contribution by AMTEGA to the draft BEREC Guidelines on very high capacity networks AMTEGA
BoR PC 02 (20) 09 30 April 2020 Contribution by Altice Portugal to the draft BEREC Guidelines on very high capacity networks Altice Portugal
BoR PC 02 (20) 15 30 April 2020 Contribution by GIGAEurope to the draft BEREC Guidelines on Very High Capacity Networks GIGAEurope
BoR PC 02 (20) 33 30 April 2020 Contribution by University of Madrid to the draft BEREC Guidelines on Very High Capacity Networks University of Madrid
BoR PC 02 (20) 22 30 April 2020 Contribution by ESOA to the draft BEREC Guidelines on Very High Capacity Networks ESOA
BoR PC 02 (20) 17 30 April 2020 Contribution by Open Fiber to the draft BEREC Guidelines on Very High Capacity Networks Open Fiber
BoR PC 02 (20) 06 30 April 2020 Contribution by CableLabs to the draft BEREC Guidelines on Very High Capacity Networks CableLabs
BoR PC 02 (20) 29 30 April 2020 Contribution by eir to the draft BEREC Guidelines on Very High Capacity Networks eircom
BoR PC 02 (20) 13 30 April 2020 Contribution by Liberty Global to the draft BEREC Guidelines on Very High Capacity Networks Liberty Global
BoR PC 02 (20) 28 30 April 2020 Contribution by TIM to the draft BEREC Guidelines on Very High Capacity Networks TIM