Response by Sandvine to BEREC 2012 public consultation on net neutrality
Response by Sandvine to BEREC 2012 public consultation on net neutrality (NN), which covered 3 BEREC draft documents, namely:
1. BoR (12) 32 Draft Guidelines for Quality of Service in the scope of NN;
2. BoR (12) 33 Draft Report “An assessment of IP-interconnection in the context of NN”;
3. BoR (12) 31 Draft Report “Differentiation practices and related competition issues in the scope of NN”.
The consultation was held in the period 29 May – 31 July 2012 and was announced by a joint consultation notice BoR (12) 34.